+
  • 3(32).jpg
  • Carbon steel pipe (8).jpg
  • Carbon steel pipe (9).jpg
  • Carbon steel pipe (7).jpg
  • Carbon steel pipe (10).jpg

ST37 Carbon steel pipe

Performance and application of material ST37: the material has good performance, that is, through cold rolling, it can obtain cold rolled strip and steel plate with thinner thickness and higher precision, with high straightness ect.

Classification :

Carbon steel pipe




PRODUCT DETAILS


Performance and application of material ST37: the material has good performance, that is, through cold rolling, it can obtain cold rolled strip and steel plate with thinner thickness and higher precision, with high straightness, high surface finish, clean and bright surface of cold rolled plate in Taiwan Strait, easy to be coated, various varieties, wide application, high stamping performance, non aging, and low yield point.

 

Product Name

Carbon Steel Tube / Pipe

Thickness

1.0mm - 60mm

Diameter

6.0mm - 1422mm

Length

5800, 6000, 11800, 12000 or customized

Surface

Black skin, spray paint, pickling, oiling, galvanize,etc

Material

A106 GrB, API5L, API5CT, S235JR, S275JR, S355JR, C45, ST37, ST52, 4140, 4130, etc

Standard

GB, GOST, ASTM, AISI, JIS, BS, DIN, EN

Technology

Hot rolling, pickling, precision, cold rolling, galvanize, seamless, welding, spiral

Export packing

Waterproof paper, and steel strip packed.Standard Export Seaworthy Package.

Suit for all kinds of transport,or as required.

Minimum Order Quantity 25Tons

 

Customer Visit

For the steel industry, customer care is not just quality control,on-time delivery and offering good price, but also adding value through the services we provide. We work with customers to continuously improve steel quality to help customers obtain more efficient and effective manufacturing processes.Xinzhonglian Steel is also the only company that promises to take back products if they are not up to standard.

图片名称

PRODUCTION WORKSHOP

Based on integrity and with the purpose of providing good professional services, we use our sincere and rigorous management and professional dedication to provide excellent services and high-quality products to our esteemed domestic and foreign customers in terms of quality, price, and other aspects.


Production Workshop

Production Workshop


Production Workshop

Production Workshop


Production Workshop

Production Workshop


Production Workshop

Production Workshop


Production Workshop

Production Workshop


Production Workshop

Production Workshop

FAQ

How about the delivery time?

A:Within 15-35 days after we confirm you requirement.

What is your terms of payment ?

A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipment or based on BL copy or LC at sight.

How long does your delivery time take?

A:Generally, our delivery time is within 7-45 days, if there is a great demand or special circumstances, it may be delayed.

What are the shipping ports?

A:You can choose other ports according to your needs.

Does the product have quality inspection before loading?

A: Of course, all our products have undergone strict quality inspection before packing, and unqualified products will be destroyed.

Can you give warranty of your products?

A:Yes, we extend a 100% satisfaction guarantee on all items. Please feel free to feedback immediately if you are not pleased with our quality or service.

RELATED PRODUCTS


GET A FREE QUOTE